A new shower is only as good as what's behind the tile. We build the waterproofing and drainage right the first time, then finish with tile, glass, and fixtures that match the rest of the room.
"They were great to work with, on time, and did excellent work. Highly recommend using them."
A standalone shower install typically runs about a week once materials are on site, depending on tile complexity.
Yes, built-in benches, niches, and grab bar blocking are common additions and easiest to plan for before tile goes up.
A pan sits on top of the subfloor with a small curb; a curbless shower is built into the floor for a step-free entry. We can walk you through which fits your space.
Tell us a bit about the space and we'll get back to you to schedule a walkthrough.